Recent projects undertaken at Alps Electrical.


Our latest video case studies & drone footage.




Powering Up with a 19.1kw Solar PV System Featuring Tesla Powerwall And SolarEdge Inverters (Part 1).


In this video, we install a 19.1KW SolarEdge solar system with 44 x 435w Jinko Tiger Neo (all-black) solar panel modules, 44 x SolarEdge optimisers, 2 x 6KW SolarEdge Homewave inverters, a MyEnergi Zappi and a MyEnergi hot water solar diverter, and, of course, the mighty 13.5kWh Tesla Powerwall.


This was a stunning newly built home in the small village of Seamer, Stokesley, in the North Yorkshire countryside. This lovely customer contacted us because they were concerned about their high energy usage with their ground source heat pump, among other things. We recommended this fantastic system with the best components. We carried out this work over a few days just before Christmas 2023, and the installation is available in four episodes.



7.2 KW JA Solar Panel Installation with 10kWh of Battery Storage in Darlington.


This video is a 7.2 KW solar installation in Darlington, with 10kWh of battery storage in Darlington.


The larger system required us to apply for pre-approval from Northern Powergrid, called a G99 application. This allows the customer to connect a more powerful system to the grid to generate and feed energy back into their network. We discuss this and more in the video!




Installation of 4KW solar panels & battery storage in Yarm.


This was a challenging but rewarding job. Not only did we have to contend with the great British weather, slippy tiles, and wind, but the house did not offer one obvious route for cabling and positioning of equipment.


We spent well over an hour debating upon routes during the survey but finally came up with a suitable solution. The end result looked fantastic, and we had a very happy customer. We installed 8 x 500W JA solar panels with bird protection, a 3.7KW FOX inverter, and 10kWh of FOX battery storage on this job.




Wallbox Pulsar Max 7.4KW EV Charger installed in Ingleby Barwick.


We have installed many brands of EV chargers, with our favourite being the Myenergi Zappi. However, this was the first time installing this one. The customer had already purchased it, so we came along just to fit.


Overall, the charger was very straightforward to install; we had issues with connectivity, which we had to address but a decent charger overall.


Call our expert team:

01642 790 489

Case studies for business venues/commercial services.



Stoneacre


Stoneacre Motor Group, Yarm.


Replacement of over 100 lights at Stoneacre Motor Group in Yarm.

Stoneacre approached us following an audit they had that determined their lighting lux levels were too low.


After carrying out our own expert lighting lux level test throughout the building we proposed an upgrade of all the old sodium & fluorescent lighting to LED. Not only did the new lighting increase the lux levels to well over the acceptable range, but also will reduce their energy costs drastically, as the old lighting was out-dated and demanded a lot of energy.


Throughout the entire building, including showroom, paint bays, workshop and body shop, we replace over 100 lights.


After the success of the indoor lighting, we were then tasked with upgrading the outside lights to LED.




Stoneacre


Stoneacre Motor Group, Northallerton.


Stoneacre were so pleased with the work carried out at their Yarm branch, they asked us to do the same at their Northallerton branch.


This involved replacing 12 high bay sodium lights in their workshop area with brand new Collingwood LED lights.


The lux levels were immediately improved significantly, and the coming months would show an improvement in energy savings.




The Nuthatch Cocktail Bar


The Nuthatch, Middlesbrough.


We were called to a fault at The Nuthatch initially and found this to be a faulty RCBO in the consumer unit. This was subsequently replaced.


This lovely cocktail bar was also due it’s 5 yearly EICR (Electrical Installation Condition Report), and so this was carried out over the course of a full day whilst the venue was closed.


Some remedial work was identified and swiftly rectified to bring the installation up to the current BS7671 standards.




The Townhouse Nightclub


The Townhouse, Middlesbrough.


We carried out a 5 yearly EICR (Electrical Installation Condition Report) at The Townhouse in Middlesbrough. This is a very large venue with a total of 8 consumer units.


Several issues were identified; however, we soon had these rectified, and the installation was brought up to the current BS7671 standards.




The Fox Covert Inn


The Fox Covert Inn, Yarm.


This lovely local public house contacted us as they were experiencing their lights tripping in the male and female toilets.


We swiftly attended and identified the issue was a faulty leg of cable between two lights in the male toilets.


Due to the age and nature of the building it was not worth disturbing the decor to try and find the damaged cable. Instead, it was agreed we would replace it and run the cable in surface trunking in the toilets to avoid disruption and damage.


The job looked very neat and tidy and importantly the customers could now see where they were going!




Chi Beauty & Massage Salon


Chi Beauty & Massage Salon, Middlesbrough.


Unfortunately, we were not going here for a nice massage but to carry out a 5 yearly EICR (Electrical Installation Condition Report).


We carried this work out during business closure hours to limit the impact on the business and customers and found the electrical installation to be in very good order. We left a happy customer with a 'satisfactory' report, good for another 5 years.




Hutton Rudby Doctors Surgery


Hutton Rudby Doctors Surgery, Yarm.



We were contacted by the surgery to install some replacement storage heaters that were more efficient than the existing heaters.


The old storage heaters were under performing and drawing too much electricity. The technology available with new storage heaters has far surpassed the older units and it was time for an upgrade.


Due to the nature of this building, we arranged a weekend installation date as to minimise the disruption to patients and staff.


We also carried out the 5 yearly EICR (Electrical Installation Condition Report) on the same weekend.




ea Funeral Service


Rea Funeral Service, Stokesley.


We carried out various projects throughout the 3 branches of M & B Rea Funeral Homes, located in Stokesley, Hutton Rudby and Darlington. Various work undertaken was to install new downlights, new electric heaters, and also carried out fault diagnosis.




Brookfield Care Home, Lazenby


Brookfield Care Home, Lazenby.


We carried out extensive remedial works following an EICR that had ben carried out by another company. The client wished to instruct ourselves to carry out the remedial work, which we did over the course of a few weeks due to the sensitive nature of the building.


We ensured not to disturb the residents too much and work around their routines as much as possible.



Call our expert team:

01642 790 489

Case studies for households/domestic services.



Solar PV & Battery Billingham


Solar PV & Battery, Billingham.


A 4.05kw solar array of 10 x 405w panels with 7.5kWh of battery storage was installed in Billingham.


We discussed our customer's requirements and current usage and worked closely with them to offer a system to meet their needs.


They are now enjoying significant savings and left us this excellent review:


"Great service from start to finish. Installed Solar panels with battery storage. Advised on the system size to suit my needs, including the number of panels and batteries. Excellent workmanship throughout the job. Arrived early and worked late, worked non-stop until the job was completed. All set up and working, including the app, walked through the system with me. Highly recommend these guys."




Solar PV & Battery Kirklevington


Solar PV & Battery, Kirklevington.


A 4.92kw solar array of 12 x 410w solar panels with 10kWh battery storage is installed in Kirlevington.


This house had its challenges regarding height, as it was a second-floor flat with minimal loft space. However, those challenges were swiftly overcome, and this customer ended up with a beautiful array of black mono panels that produced fantastic results. As always, we had a happy customer, and they left us this lovely review:


"Fantastic service from start to finish. Great advice and fully informed throughout from Andy. The scaffold was only up a few days too. I am over the moon with the installation and am impressed with my savings. The solar panels have been up and running, and I am delighted. We have had the washer, dryer on, TV, etc., all powered by the sun and using no electricity from the grid!! The battery is great too, as any power we do not use is stored for when the sun is not out. Great stuff. Would recommend."




EV Charger Installation Nunthorpe


EV Charger Installation, Nunthorpe.


We installed this beautiful Andersen charger for a customer in Nunthorpe who really wanted an aesthetically pleasing charger. This brand offers customisable chargers that you can match to the colour of your front door. The customer was thrilled with the end result and left us this great review:


"Highly recommend! Excellent work, friendly and very informative. A fantastic next-day service when others were quoting 6 weeks or longer. Very professional and provided a higher spec appliance at the same price as I had been quoted elsewhere for inferior equipment. Andy took the time to explain the various options and made the whole experience simple and fuss-free. I could not recommend ALPS more highly. Don't go anywhere else."




EV Charger Installation Stainton


EV Charger Installation, Stainton.


Another Myenergi Zappi EV charger installation. This was quite a long cable run, so we had to up-rate the cable to compensate for the voltage drop. This customer bought a stunning Audi car and needs an equally stunning charger.


We have installed hundreds of these chargers and find them to be, without a doubt, the best on the market.


It works seamlessly with Solar PV, so this is the charger for you if you are contemplating Solar and EV.




Consumer Unit Relocation & EV Charger Hutton Rudby


Consumer Unit Relocation & EV Charger, Hutton Rudby.


We carry out many consumer unit upgrades every week, which never gets any less satisfying, significantly improving the safety of a homeowner's electrical installation.


This installation was no different. We managed to have this unit up and running by the end of the day with all the electrics fully tested, ensuring the homeowner that their installation was now safer.


This customer wanted to relocate their unit to a more suitable height and location. We also installed an EV charger and internal isolator as the customer requested the ability to isolate it from inside the property.


Every upgrade must include a full test of the existing cabling, which means you get an insight into the state of the cables and what is going on behind the walls and under the floors.


This was a happy customer, and they left us this lovely review:


Punctual. Job done in a very professional and efficient way with minimal disruption. Safety issues found during the work were clearly explained to us, as was the use of the unit and reassurance that we could contact with any future queries or concerns. Installation certificates were received the next day. We were very pleased with the work done and this firm will be our first choice for any electrical work we need. We would unreservedly recommend them after the experience we have had."




Consumer Unit Relocation & EV Charger Darlington


Consumer Unit Relocation & EV Charger, Darlington.


Sometimes we are called to quote for the installation of a particular system, in this case, a new EV charger, and we find the current electrical installation unsuitable to cater for it. This job was no exception and, in fact, required a full consumer unit upgrade before the charger could be installed.


This was a substantial property with 3-4 separate fuse boards, which we merged into one brand-new dual RCBO consumer unit with surge protection. We then installed a Myenergi Zappi on a 30-metre cable run from the new consumer unit around the property's outer wall to the charger location.